Senior supervision, site supervision, and inspection of items and equipment in relation to the requirements of the water extraction plant from iron ore concentrate tailings of Sirjan Iranian Steel Co.

Sirjan Iranian Steel Co. (SISCO) affiliated with the Middle East Mines & Mineral Industries Development Holding Co. (MIDHCO), is currently exploring the possibility of constructing a dewatering plant to recover water from the tailings of the thickener underflow in phases 1 and 2 of its iron ore concentrate production factory. This proposed plant would allow for the recovery of water from the tailings generated from the processing lines of phases 1 and 2, ultimately enabling the recycled water to be reintroduced back into the concentrate production cycle through a dewatering process.

The entering volume of the dewatering plant from the mentioned tailings is 856 t/h pulp with a solid percentage of approximately 50 percent (428 t/h solid and 428 t/h water), and in the factory process, the high-quality product that can be reused in the concentrate production process should be returned to the production circle, and the semi-dried cake with a maximum moisture of 18 percent will be considered as waste. In this project, Kavoshgaran Consulting Engineers provides consulting services, general and staff engineering, and supervision of EPC contractor’s activity.

:Project’s Title

Senior supervision, site supervision, and inspection of items and equipment in relation to the requirements of the water extraction plant from iron ore concentrate tailings of Sirjan Iranian Steel Co.

:The year of the project

December 20, 2020 – March 20, 2023

:Employer

Sirjan Iranian Steel Co

:Project Manager

Eng. Proshat Maleki

Project Progress Chart

Physical Progress